SEECO Environmental Services Inc.

UST-Management
and Removal
Leaking UST-Services
TACO Investigations-35
IAC IEPA Part 742
Phase I & II - Environmental
Site Assessments
Phase III-Remediation
Design
Phase IV-Remediation
Construction
Heavy Metals-Remediation and
Cleanup
On-site Mobile
Laboratory-(BTEX/VOC Analyses)
Wetland-Studies and
Permits (404B - CWA)
Ground Water-Slug and Pumping
Tests
Hydrogeological and Geotechnical Engineering and Design, Field
Monitoring of Landfill Construction and Closure
Environmental Drilling and Sampling-/Geoprobe® and
Hydroprobe® Sampling and Shelby Tubes and Piston Samples
Groundwater Monitoring Well Installation
Soil Vapor Extraction & Monitoring Design, Installation,
& Operation
In-situ Bioventing System Design, Installation, & Operation
Complete Geotechnical Laboratory, Hydraulic
Conductivity
Last
modified: April 24, 2009